Our Projects

COMPLETED

Client

Work Order No/ Name of the work.

SAIHAM Knit Composite Ltd.

Printing & embroidery repair, Mosque repair, Boundary wall making, security room making.

SAIHAM Knit Composite Ltd.

Retrofit work (as build) at main floor (10 ton building) all complete.

SAIHAM Knit Composite Ltd.

Retrofit work (rain water protection work) all complete at green floor.

SAIHAM Knit Composite Ltd.

Boundary wall repair work with new birbed wiring.

SAIHAM Knit Composite Ltd.

Service work

SAIHAM Knit Composite Ltd.

Green building toilet rebuild all complete, Pump room making for fire hydrant system all complete, new boiler room construction, patent stone work at special floor roof all complete.

Gramtech KDFGIL

Retrofitting and roof sheeting.

Gramtech KDFGIL

Dismantling and renovation

Gramtech KDFGIL

Skylight

Gramtech KDFGIL

New shed at Dhuptara

Gramtech KDFGIL

Supply & Installation of lift tower bridge pillar

Gramtech KDFGIL

Civil Work

Gramtech KDFGIL

Civil Renovation Work

Team Limited

Lift Core pit and machine room constructions.

SAIHAM Knit Composite Ltd.

Boundary wall repair work with new barbed wiring.

SAIHAM Knit Composite Ltd.

General store, MNS Store

Starlight Sweaters Ltd. (A concern of Labib Group)

Work order for fitting and fixing of Thai glass at Shed-1 front elevator.

IT-Sinohydro (JV) through Abdullah Constructions at MRT Diabari, Uttara Project

U-shape concrete gutter construction for storm drainage at depot under contract no. CP02.

MES, Savar Cantonment (through M/S Global Trade Incorporate)

Vertical extension of oxidation plant 1st floor (2 storied foundation) over existing ground floor (BLDG no Up-192) including ancillary works for 115 FD WKSP at Savar CANTT.

4A YARN DYING LTD.

Facelifting

4A YARN DYING LTD.

Civil work for the modification of pump and panel room for relocating fire pump.

Gramtech KDFGIL

Retrofitting work of lift shaft at gramtech.

Gramtech KDFGIL

ACP Work

Gramtech KDFGIL

Civil Renovation Work

TEAM Limited

Civil Work (Generator Base)

Gramtech KDFGIL

Gramtech main gate civil work.

Chittagong City Corporation

Development of Rampur Road Development of Port Connecting Road by Lane Development of Sobujbag Noya Bazar Road at 25 no Ward.

Standard Asiatic Oil Company Limited.

Civil Work of 3 Storied Pre-Fabricated Office Building at SAOCL, Mongla Oil Installation, Mongla Khulna.

ONGOING

Client

Work Order No/ Name of the work.

Chittagong City Corporation

Development of Box Ali Munsi Road at 39 no Ward

Chittagong City Corporation

Development of Ashrafia H/S road and Development of Boro Moulobi Moulana Abdur Rahaman Hossain Member and Abdul Hakim Road at 18 no East Bakalia Ward.

PWD, Chittagong Division-2

Construction of 03 Storied Building with 03 Storied Foundation of Anwara Upazilla Model Masjid and Islamic Cultural Center in the District of Chattogram Under the project Establishment of 560 Model Masjid and Islamic Cultural Centers in Zilla and Upazilla of Bangladesh

Youth Spinning Mills Limited

Constructions of Two storied ring spinning factory building with four storied service bay.

Standard Asiatic Oil Company Limited.

Construction of 3 Storied Pre-Fabricated Boiler Room & Pump House at SAOCL, Main Installation, Chattogram.

ANSAR & VDP HQ, Khilgaon, Dhaka

ব্যাটালিয়ন সদর দপ্তর, ঘাগড়া, রাঙ্গামাটি সদরে ক্ষতিগ্রস্থ রিটেইনিং ওয়াল সংস্কার এবং টিলার উপর হতে নীচ পর্যন্ত ড্রেইন সম্প্রসারণ, মেরামত ও সংস্কারকরণ কাজ।

ANSAR & VDP HQ, Khilgaon, Dhaka

ব্যাটালিয়ন সদর দপ্তর, পটিয়া, চট্রগ্রামে একটি গভীর নলকূপ স্থাপন ও পানি সরবরাহ লাইন মেরামত ও সংস্কার কাজ।

LGED, Cox'sbazar

Construction of Hill Slope Protection at Ukhiya i) Camp-20 Nutrition Center to IOM site Management Center, 335.00m ii) Camp-20 FDC to DAM School Learning Center, 433.00m iii) Camp-20 FDC to TDS Center, 450.00m (Total=1.218 Km) Salvage cost Tk. 199473.00 under Ukhiya upazila, Dist: Coxs Bazar.

LGED, Cox'sbazar

Construction of Internal Road & Stair with Drainage facilities Inside the Camp in Ukhiya i) Camp-20 Ext. CIC Office to Camp-19 Road 1790.00m ii) TV Tower to Army Road (Near Non-Food Distribution Centre) 2350.00m iii) TV Tower Road Camp-6 Road, 400.00m iv) Camp-12 CIC Office to Camp-20 Road (Upto Bazar) 1150.00 m v) Camp-20 Football Field to Camp-20 Ext. Road (Nutrition Center) 600.00m (Total 6.29 km.) Salvage cost Tk. 1677505.00 under Ukhiya upazila, Dist: Coxs Bazar.